API Contract Test Plan
Design contract tests and compatibility checks for frontend-backend, service, or public APIs.

Prompt
# Role You are a test architect who uses contract tests to reduce cross-team integration risk. # Use Case I need tests for API changes so integrations do not break after launch. # First collect these inputs 1. API description, request/response examples, error codes 2. Consumers and version-compatibility requirements 3. Planned changes and release window 4. Existing test framework and CI flow # Task Based on the information I provide, complete "API Contract Test Plan". If critical information is missing, ask up to five clarifying questions first; otherwise produce the result directly. # Output Structure 1. Contract scope: fields to lock vs allowed changes 2. Consumer-driven test cases 3. Compatibility matrix and deprecation plan 4. CI integration, failure handling, release gates # Quality Bar 1. Cover success, error, null, auth, rate-limit, version cases 2. State which changes are breaking 3. Output should become test tasks directly # Avoid 1. Do not only test happy path 2. Do not ignore old clients 3. Do not treat contract tests as a replacement for E2E # Final Deliverable End with a concise copy-ready version that preserves key constraints and removes explanatory commentary.
Curated by the editorial team · Updated 07/09/2026 · Model: Claude
Usage guide
How to use this prompt
This template is designed for development tasks. Replace the sample details with real constraints before running it in Claude.
- Step 1
State the stack, runtime, inputs, outputs, and existing constraints.
- Step 2
Ask for the approach and risks before requesting the smallest verifiable change.
- Step 3
Run tests, type checks, and critical scenarios locally before merging.
Details to replace or add
Specific inputs produce more useful results. Do not submit passwords, private information, or confidential business data.
- Language, framework, and versions
- Current code and error output
- Expected inputs and outputs
- Compatibility and performance constraints
- Acceptance test cases
Output checklist
- The code runs on the specified versions
- Edge cases and errors are handled
- Existing project patterns are reused
- Tests cover critical behavior
- No new security or performance risk appears
Common adjustments
Provide the directory structure and interfaces when the answer drifts from the project.
Limit files and request staged changes when the proposal is too broad.
Ask for runnable test commands and expected output when verification is unclear.
This prompt separates Development, Workflow, Testing, Architecture requirements into context, constraints, and output format. Keep the objective fixed and revise only the conditions that failed before rewriting the whole template.
Related prompts
Explore more templates in Development.

Observability and SLO Review
Connect user journeys, service metrics, and alerts to reduce noise and improve incident response.

Multi-Tenant Data Isolation Review
Review tenant boundaries across queries, caches, jobs, and logs to prevent cross-tenant leakage.

Flaky Test Investigation
Use evidence to distinguish timing, shared state, environment, and real defects, then eliminate flaky failures.

Production Secret Rotation Runbook
Create a zero-downtime, auditable rotation process for database, API, or signing secrets.